tradethepoolpool ads

Webster Financial $WBS Proactive Strategies

Longer Term Trading Plans for WBS
  • NONE. Details
  • There is no current Support Plan to trigger a buy of this stock at this time. This usually means that there are no clear support levels at this time, so buying the stock as it falls could be considered catching a falling knife. Buy signals only exist if resistance breaks higher.
    This often is a signal that the stock you are watching is weak. Waiting for a turn higher may be more intelligent than trying to catch a falling knife. In any case, new support levels are usually revised to the database at the beginning of the next trading session.

  • Short WBS slightly under 40.97, target n/a, stop loss @ 41.09 Details
  • The technical summary data is suggesting a short of WBS as it gets near 40.97, but the downside target is not available from the current data. This tells us to hold that position if it is triggered until a new downside target has been established (updates occur at the beginning of every trading session) or until the position has been stopped. The summary data tells us to have a stop loss in place at 41.09. 40.97 is the first level of resistance above 33.32, and by rule, any test of resistance is a short signal. In this case, if resistance 40.97 is being tested, so a short signal would exist.

Swing Trading Plans for WBS
  • Buy WBS slightly over 33.71, target 40.97, Stop Loss @ 33.61 Details
  • If 33.71 begins to break higher, the technical summary data tells us to buy WBS just slightly over 33.71, with an upside target of 40.97. The data also tells us to set a stop loss @ 33.61 in case the stock turns against the trade. 33.71 is the first level of resistance above 33.32, and by rule, any break above resistance is a buy signal. In this case, 33.71, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short WBS slightly near 33.71, target 31.38, Stop Loss @ 33.81. Details
  • The technical summary data is suggesting a short of WBS if it tests 33.71 with a downside target of 31.38. We should have a stop loss in place at 33.81 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, 33.71, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Day Trading Plans for WBS
  • Buy WBS slightly over 33.71, target 40.97, Stop Loss @ 33.63 Details
  • If 33.71 begins to break higher, the technical summary data tells us to buy WBS just slightly over 33.71, with an upside target of 40.97. The data also tells us to set a stop loss @ 33.63 in case the stock turns against the trade. 33.71 is the first level of resistance above 33.32, and by rule, any break above resistance is a buy signal. In this case, 33.71, initial resistance, would be breaking higher, so a buy signal would exist. Because this plan is based on a break of resistance, it is referred to as a Long Resistance Plan.

  • Short WBS slightly near 33.71, target 31.90, Stop Loss @ 33.79. Details
  • The technical summary data is suggesting a short of WBS if it tests 33.71 with a downside target of 31.90. We should have a stop loss in place at 33.79 though in case the stock begins to move against the trade. By rule, any test of resistance is a short signal. In this case, if resistance, 33.71, is being tested a short signal would exist. Because this plan is a short plan based on a test of resistance it is referred to as a Short Resistance Plan.

Check the time stamp on this data. Updated AI-Generated Signals for Webster Financial (WBS) available here: WBS.

WBS Ratings for May 10:

Term →Near Mid Long
Rating Weak Strong Weak
P1 0 0 40.97
P2 31.90 31.38 46.94
P3 33.71 33.71 53.10
Triggers may have already come
Get Real Time Triggers Here
AI Generated Signals for WBS

WBS Long Term Analysis for May 10 2023

Blue = Current Price
Red= Resistance
Green = Support

Real Time Updates for Repeat Institutional Readers:
Instructions:
  • Click the Get Real Time Updates button below.

  • In the login prompt, select forgot username

  • Type the email you use for Factset

  • Use the user/pass you receive to login

  • You will have 24/7 access to real time updates.

From then on you can just click to get the real time update whenever you want.

GET REAL TIME UPDATES

Our Market Crash Leading Indicator isEvitar Corte.
  • Evitar Corte warned of market crash risk four times since 2000.

  • It identified the Internet Debacle before it happened.

  • It identified the Credit Crisis before it happened.

  • It identified the Corona Crash too.

  • See what Evitar Corte is Saying Now.

Get Notified When our Ratings Change:Take a Trial

Don't over think it!  Trading Webster Financial (NYSE: WBS) or any other stock can be rewarding if the simple rules of technical analysis are observed before making any decisions.  This should be an integral part of the investment process.

Warning:

This is a static report, the data below was valid at the time of the publication, but support and resistance levels for WBS change over time, so the report should be updated regularly.  Real Time updates are provided to subscribers.  Unlimited Real Time Reports.

Subscribers also receive market analysis, stock correlation tools, macroeconomic observations, timing tools, and protection from market crashes using Evitar Corte.  

Instructions:

The rules that govern the data in this report are the rules of Technical Analysis.  For example, if WBS is testing support buy signals surface, and resistance is the target.  Conversely, if resistance is being tested, that is a sign to control risk or short, and support would be the downside target accordingly.  In each case, the trigger point is designed to be both an ideal place to enter a position (avoid trading in the middle of a trading channel), and it acts as a level of risk control too.

Swing Trades, Day Trades, and Longer term Trading Plans:

This data is refined to differentiate trading plans for Day Trading, Swing Trading, and Long Term Investing plans for WBS too.  All of these are offered below the Summary Table.